Labor is one of the busiest places for BPMs. Every clock-in, end activity and time entry goes through Erp.BO.Labor.Update, whether it comes from MES, Time and Expense Entry or a shop-floor integration. That makes it a good place to enforce shop-floor rules, and a place where a slow or careless directive is felt by everyone.

Most labor rules apply when the operator finishes an activity and reports quantity. In the labor tableset that’s an updated LaborDtl row with EndActivity set:

var ending = ds.LaborDtl
.Where(l => l.RowMod == IceRow.ROWSTATE_UPDATED && l.EndActivity)
.ToList();

Other useful fields on LaborDtl:

Field Meaning
LaborType "P" production, "S" setup, "I" indirect
LaborQty Quantity reported on this entry
JobNum, AssemblySeq, OprSeq The job operation being worked
EmployeeNum The employee’s ID
ReWork The entry is rework
ResourceGrpID, ResourceID, JCDept Where the time and cost are charged

Put rules that validate or change these rows in pre-processing. Changes made to ds in post-processing go back to the screen but aren’t saved.

Example: don’t report more than the previous operation completed

Section titled “Example: don’t report more than the previous operation completed”

A common request: an operation can’t report more good parts than the operation before it has completed. This pre-processing directive checks each production entry being ended:

foreach (var labor in ds.LaborDtl.Where(l =>
l.RowMod == IceRow.ROWSTATE_UPDATED && l.EndActivity &&
l.LaborType == "P" && !l.ReWork && l.LaborQty > 0))
{
var ops = Db.JobOper
.Where(o => o.Company == labor.Company && o.JobNum == labor.JobNum
&& o.AssemblySeq == labor.AssemblySeq && o.OprSeq <= labor.OprSeq)
.OrderByDescending(o => o.OprSeq)
.Select(o => new { o.OprSeq, o.QtyCompleted })
.Take(2)
.ToList();
if (ops.Count < 2) continue; // first operation on the assembly: nothing to compare
var thisOp = ops[0];
var prevOp = ops[1];
if (thisOp.QtyCompleted + labor.LaborQty > prevOp.QtyCompleted)
{
throw new Ice.BLException(
$"Operation {prevOp.OprSeq} has only completed {prevOp.QtyCompleted:0.##}. " +
$"Operation {labor.OprSeq} can't report more than that.");
}
}

It reads both operations in a single query, and only runs for production entries that report a quantity, so indirect time and setup aren’t slowed down.

Limitations to decide on before you roll it out:

  • Different quantity per parent. If operations have different quantities per parent, compare per-parent quantities rather than raw quantities.
  • Overlapping operations. Operations set to run start-to-start work in parallel, so the next one may legitimately report before the previous one does.
  • Subcontract operations. Their completed quantity comes from receipts rather than labor, so decide how an operation that follows one should be checked.
  • Editing old entries. The check assumes the entry’s quantity isn’t already counted in QtyCompleted, which holds when ending an activity. Editing already-posted labor needs different handling.

A simpler alternative is to require the previous operation to be marked complete (JobOper.OpComplete). It’s far less code, but it relies on operators completing operations consistently.

Example: charge time to the employee’s resource

Section titled “Example: charge time to the employee’s resource”

If operators can clock onto any operation from any terminal, labor can end up charged to the wrong resource or department. This pre-processing directive replaces them with the employee’s own defaults at clock-out:

foreach (var labor in ds.LaborDtl.Where(l => l.RowMod == IceRow.ROWSTATE_UPDATED && l.EndActivity))
{
var emp = Db.EmpBasic
.Where(e => e.Company == labor.Company && e.EmpID == labor.EmployeeNum)
.Select(e => new { e.ResourceGrpID, e.ResourceID, e.JCDept })
.FirstOrDefault();
if (emp == null || string.IsNullOrEmpty(emp.ResourceID)) continue;
labor.ResourceGrpID = emp.ResourceGrpID;
labor.ResourceID = emp.ResourceID;
labor.JCDept = emp.JCDept;
}

Variations:

  • Use the scheduled resource instead. The operation’s scheduled production and setup details are in JobOpDtl, identified by JobOper.PrimaryProdOpDtl and JobOper.PrimarySetupOpDtl. Map production entries to the first and setup entries to the second.
  • Burden rate. Changing the resource doesn’t necessarily change LaborDtl.BurdenRate. If yours must follow the new resource, read the resource’s (or resource group’s) burden settings and set the rate yourself. A percentage burden type means the labor rate times the percentage; a flat type means the rate as entered.

Make sure the rest of your shop-floor reporting agrees. If a third-party terminal system expects its own resource on the labor record, remapping in Epicor can break that system’s reports. Often the cleaner fix is to stop operators clocking onto operations that aren’t scheduled on their resource.

When an activity is ended with Request Move ticked, Epicor raises a request to move the completed quantity on, to the next operation or to stock. If your shop doesn’t use move requests, stray ones clutter the material queue.

  1. Create a pre-processing directive on Erp.BO.Labor.Update.
  2. Add Set Field: set LaborDtl.RequestMove (check the exact field name in your version) of all rows to false.

If some resources should always move their output automatically, configure that on the resource rather than relying on operators ticking the box.

  • Filter on RowMod, EndActivity and LaborType before any database query.
  • Query only the operation rows you need, and select only the columns you use.
  • Clock-ins and clock-outs happen in bursts at shift change; a directive that takes a second per call holds up a queue of operators.